Galvanized steel plate waterstop / water stop steel plate / steel waterstop belt

FOB Reference Price:Get Latest Price
US $1-15 / Meter | 200 Meter/Meters (Min. Order)
Supply Ability:
2000 Meter/Meters per Day
Any port per your request
Report Suspicious Activity
Quick Details
Other Waterproofing Materials
Place of Origin:
Henan, China (Mainland)
Brand Name:
Model Number:
Galvanized steel plate waterstop
steel, galvanized iron
Surface Treatment:
200/300/330/350/400mm or customized
2/3/4mm or customized
anti-corrosion, durable
Package Detail:
On Pallet
Sales Mode:
Factory sales directly
Packaging & Delivery
Packaging Details
in bulk or as your requirements
Delivery Time
Within 3 days
Product Description

Steel plate waterstop can be mainly divided into: general steel plate waterstop, galvanized steel plate waterstop, stainless steel plate waterstop, specifications for: 200*2、200*3、300*2、300*3、350*2、350*3、400*4、330*5, and other specifications.And it also can be customized according to the user's requirements.

It can change seepage path and extend the infiltration routes. It is anti-corrosion, suitable for construction condition that contains corrosion water. It can guarantee the protecting effect of projects.

Usage: Tunnel, subway, DAMS, tunnels, water conservancy and hydropower engineering construction joint, high-rise building basements, underground parking and other major engineering construction joints.


Mainly used for reinforced concrete structures, DAMS and other large projects


Zhengzhou Matsushige Building Materials Co. Ltd is an experienced and professional manufacturer of building materials. It is located in Zhengzhou City, Henan Province, China.

Our products are widely used in domestic markets and important projects. These years, our products having been exported to many countries and received good reputation. Such as Malaysia, Dubai, USA, Vietnam, Laos etc.

We see "quality, integrity and good service" as the basis for developing of our factory. We have rigid quality control system from raw material choosing to manufacturing and delivery. What's more, our products and services which were well received by the masses of users for more than 5000 engineering since it set up, when was seven years ago. If you are still in anxiety, we can also provide the third party reports of more than 5000 projects in domestic.

Related Products

The customized rubber waterstop

91.8% Response Rate

customized 3 Stage Water Stop Anchor Bolt

91.8% Response Rate

Adjustable Screw Jack For Scaffolding

91.8% Response Rate

Packing & Delivery

Packing Details : in bulk or as your requirements

Delivery Details : 5-15days


Q: Are you trading company or manufacturer ?
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 10-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.

Contact us